Advanced spotlight: enforce done rules with checklist completion

When to use this​

Use this example when you want a work item to stay open until a required checklist is fully complete.

This is a good fit for:

  • Definition of done enforcement.
  • Release sign-off gates.
  • Compliance or audit-sensitive processes.

What this setup helps prevent​

  • Moving work to Done while required checks are still open.
  • Treating checklist completion as optional when it should be enforced.
  • Teams interpreting "ready to close" differently.

Example checklist​

You can pair this setup with a practical checklist such as:

  • Review completed.
  • Validation completed.
  • Documentation updated if needed.
  • No blockers remain.

How the pattern works​

  1. Create a template with a mapped content field and a mapped Complete field.
  2. Add the checklist to the relevant work item type.
  3. Configure an Azure DevOps work item rule that prevents a move to Done or Closed when the Complete field is empty.
  4. Test the behavior with both incomplete and complete checklist states.
  5. Leave the Complete field without a default value, scope the template to the teams that use the checklist, and turn on Set the Complete field to N/A on work items this template does not apply to. Work items that no template applies to then get N/A when the form opens, so the process-wide rule does not block everyone else. See Preventing moving work items to done while a checklist is not completed.

Why this is an advanced spotlight​

This pattern is powerful because it connects the checklist UI to workflow enforcement. It moves the checklist from a helpful reminder to a real process gate.

Common variations​

  • Pair a Progress field with the same template so cards also show how close the work is to completion.
  • Use the same pattern only for certain work item types or teams.
  • Keep the checklist lightweight if the enforced rule applies to many items.